Er. Perumal Manimekalai College of Engineering (PMC Tech) — home AutonomousAccredited by NAAC with 'A' Grade Approved by AICTE, New DelhiAffiliated to Anna University, Chennai
Study Learning spaces

Classrooms & IT

The classrooms, auditoriums and seminar halls are ICT-enabled: each has an LCD projector, an audio system and a network connection, in the Main, East and West blocks alike.

Classrooms
41
Auditoriums
2
Seminar halls
2
Internet
300 Mbps
Teaching spaces Media Centre
A seminar hall set for a meeting, its projector showing on the screen
Students at rows of computers in a PMC Tech laboratory

Teaching spaces

Rooms equipped for teaching

The same equipment in every room, from the first-year classrooms to the auditoriums.

  • 41 Classrooms For classes from the first year to the final year, ranging from 59 to 88 square metres each.
  • 2 Auditoriums One on the ground floor of the Main Block, covering 350 square metres, and the other on the fourth floor of the West Block, covering 227 square metres.
  • 2 Seminar halls One on the fourth floor of the Main Block, covering 120 square metres, and the other on the fourth floor of the West Block, covering 80 square metres.

In every room

  • LCD projector
  • Audio system
  • LAN connection
A full classroom of students in uniform, smiling and giving a thumbs-up
A long table and chairs in a seminar hall, facing a projector screen
Every room 45 rooms

The location, size and geo-tagged photograph of each classroom, auditorium and seminar hall.

Every room
S No TYPE Block Floor Hall Number LCD Projector Audio System LAN Area in Sq.m Linked for Geo Tagged Photos
1. AuditoriumMain BlockGround Floor5YESYESYES350AUDITORIUM
2 ClassroomMain BLockFirst Floor6YESYESYES88FIRST YEAR- A
3 ClassroomMain BLockFirst Floor7YESYESYES73FIRST YEAR- B
4 ClassroomMain BLockFirst Floor8YESYESYES72FIRST YEAR- C
5 ClassroomMain BLockFirst Floor9YESYESYES72FIRST YEAR- D
6 ClassroomMain BLockFirst Floor10YESYESYES72FIRST YEAR- E
7 ClassroomMain BLockFirst Floor11YESYESYES73FIRST YEAR- F
8 ClassroomMain BLockSecond Floor13YESYESYES60ME-IYEAR CSE
9 ClassroomMain BLockSecond Floor15YESYESYES62ME-II YEAR CSE
10 ClassroomMain BLockSecond Floor17YESYESYES72CSE –II YEAR
11 ClassroomMain BLockSecond Floor18YESYESYES72CSE –III YEAR
12 ClassroomMain BLockSecond Floor19YESYESYES72CSE –IV YEAR
13 ClassroomMain BLockSecond Floor22YESYESYES72ECE –II YEAR
14 ClassroomMain BLockThird Floor27YESYESYES59ECE –III YEAR
15 ClassroomMain BLockThird Floor29YESYESYES59ECE –IV YEAR
16 ClassroomMain BLockThird Floor30YESYESYES59ME-IYEAR ECE
17 ClassroomMain BLockThird Floor31YESYESYES59ME-IIYEAR ECE
18 ClassroomMain BLockThird Floor35YESYESYES59ECE–IV YEAR/BSECTION
19 Seminar HallMain BLockFourth Floor46YESYESYES120SEMINAR HALL
20 ClassroomMain BLockFourth Floor42YESYESYES60MCACLASS ROOM
21 ClassroomMain BLockFourth Floor43YESYESYES60MBA-I YEAR
22 ClassroomMain BLockFourth Floor45YESYESYES60MBA-IIYEAR
23 ClassroomEast BlockFirst FLoor56YESYESYES72EEE-II YEAR
24 ClassroomEast BlockFirst FLoor57YESYESYES72EEE-III YEAR
25 ClassroomEast BlockFirst FLoor58YESYESYES72EEE-IV YEAR
26 ClassroomEast BlockSecond Floor60YESYESYES72IT-II YEAR
27 ClassroomEast BlockSecond Floor61YESYESYES72IT-III YEAR
28 ClassroomEast BlockSecond Floor62YESYESYES72IT-IVYEAR
29 ClassroomEast BlockThird Floor63YESYESYES72MCO-II YEAR
30 ClassroomEast BlockThird Floor64YESYESYES72MCO-III YEAR
31 ClassroomEast BlockThird Floor65YESYESYES72MCO-IV YEAR
32 ClassroomWest BlockGround FLoor81YESYESYES79AERO-II YEAR
33 ClassroomWest BlockGround FLoor82YESYESYES77AERO-IIIYEAR
34 ClassroomWest BlockGround FLoor83YESYESYES65AERO-IV YEAR
35 ClassroomWest BlockFirst Floor85YESYESYES79CIVIL-II YEAR
36 ClassroomWest BlockFirst Floor86YESYESYES77CIVIL-III YEAR
37 ClassroomWest BlockFirst Floor87YESYESYES65CIVIL –IV YEAR
38 ClassroomWest BlockSecond Floor90YESYESYES72MECH-II YEAR/ASECTION
39 ClassroomWest BlockSecond Floor91YESYESYES72MECH-II YEAR/BSECTION
40 ClassroomWest BlockThird Floor94YESYESYES72MECH-III YEAR/ASECTION
41 ClassroomWest BlockThird Floor95YESYESYES72MECH-III YEAR/BSECTION
42 ClassroomWest BlockThird Floor96YESYESYES72MECH-IVYEAR/ASECTION
43 ClassroomWest Blocksecond Floor89YESYESYES72MECH-IV YEAR/BSECTION
44 AuditoriumWest BlockFourth FloorA1YESYESYES227AUDITORIUM
45 Seminar HallWest BlockFourth FloorA2YESYESYES80SEMINAR HALL

Computing

Computers and the network

The college added computers, workstations and servers in stages and increased its internet connection speed to 300 Mbps in 2019.

  1. 2008

    • 225 computers
    • 2 servers
  2. 2010

    • 320 computers
    • 30 workstations
    • 5 servers
  3. 2013

    • 20 computers
  4. 2019

    • Internet connection speed increased to 300 Mbps
A lecturer helping students at their computers in a computer laboratory
The systems, with their configurations 8 entries

Each addition, year by year, as the IT inventory records it.

The systems, with their configurations
Updation in system No of systems included Year of Updation Configuration
COMPUTERS 2252008HP 512MB/ 80GB / CRT MONITOR
SERVER 022008HP 1GB RAM / CRT MONITOR
COMPUTERS 3202010HP 1GB RAM/ 320GB HDD /TFT MONITOR -18.5′
WORKSTATIONS 302010HP INTELC2D/ 4GB/ 320GB / TFT MONITOR -18.5′
SERVER 042010XEON QC 2GB/2X146GB / TFT MONITOR -15.6′
SERVER 012010XEON QC 4GB/2X146GB / TFT MONITOR -15.6′
COMPUTERS 202013DELL OPTIPLEX i3/ 4GB/500GB / TFT MONITOR -18.5′
INTERNET BAND WIDTH 12019UPGRADED TO 300 Mbps

Laboratories

Looking for the laboratories?

Each department runs its own laboratories, and the centres of excellence work in robotics, manufacturing, renewable energy and electric vehicles.

Study

More in Learning spaces